92 Rivonia Road CCTV Pipe inspection

Site:
92 Rivonia Road

Situation:
On the completion of 92 Rivonia Rd, the main contractor connected the sewer system to existing municipal system.

92 Rivonia Rd wanted to confirm that all the new sewer pipes and storm water pipes was in good condition.

They also wanted to confirm that the municipality sewer system was in good condition and can sustain new volumes of water from the new pipes.

Solution:
BK Pipe Solutions were tasked with the CCTV Inspection of both sewer pipes ranged between 100mm and 150mm and storm water pipes ranged between 350mm and 1m connecting 92 Rivonia Rd to the municipality lines.

On completion BK Pipe Solutions compiled a complete report for 92 Rivonia Rd as well as video footage of the sewer, storm water pipes and the Municipality line.

Download pdf of this case study