Site:
Forest Hills Phase 3 and 4.
Situation:
Johannesburg water needed to locate 5.5km of 150mm earthenware pipes under roads and paving for cleaning and repairs.
As they only needed to replace the damaged connections and sewer pipes that goes to the homes and minimize digging and disruption in the area. The pipes needed to be CCTV inspected, located and cleaned.
Solution:
BK Pipe solutions were subcontracted to do a completed CCTV inspection with a report and to clean the blocked earthenware pipes.
BK Pipe solutions has done the inspection and cleaning of the pipes, as well as given a report where the damaged connections were so that they can be replaced with minimum disruption in the area.